10.3 Locations of draining equipment

Figure 1. Cross 62 BR bilge pumps and draining

1

Electric bilge pump through fitting

6

Shut-off flap

2

Manual bilge pump through fitting

7

Open deck space drainage pipe

3

Manual bilge pump

8

Rainwater drainage shut-off valve

4

Electric bilge pump and float switch

9

Rainwater drainage through fitting

5

Rear plug